Immaculate industrial facility in the hub of the oilfield sector, conveniently located off of Hwy. 90 on Aillet Road (Chemin Metairie Ext.) Situated on over 7 acres, this facility was originally constructed in 2009 and remodeled in 2015. Four buildings containing a total of 50,500 total SF (7,378 office, 11,750 canopy, 31,372 WH) one 2 ton bridge crane, two 10 ton bridge cranes. Cade municipal water and Slemco power.